Santa Rosa County Roadwork Schedule and Events for July 2025

Thursday, Jul 10, 2025 2:24 pm ET2min read

The article reports on various road closures and resurfacing projects in Santa Rosa County, Florida. Starting July 14, Oriole Beach Road will be resurfaced from Highway 98 to Bay Street. Additionally, a portion of East Bay Boulevard will close beginning July 14, and a portion of Alderbrook Boulevard will be closed for utility work. The Navarre Beach Bridge southbound lane will also close on Fridays and Saturdays in July.

Santa Rosa County, Florida, is experiencing several road closures and resurfacing projects that will impact traffic flow in the region. Starting July 14, Oriole Beach Road will be resurfaced from Highway 98 to Bay Street. Additionally, a portion of East Bay Boulevard will close beginning July 14, and a portion of Alderbrook Boulevard will be closed for utility work. The Navarre Beach Bridge southbound lane will also close on Fridays and Saturdays in July [1].

Oriole Beach Road Resurfacing
The resurfacing project on Oriole Beach Road will begin on July 14 and is expected to last until the completion of the work. The road will be closed between Highway 98 and Bay Street during this period. The Florida Department of Transportation (FDOT) will manage the project, which aims to improve the road's surface and safety conditions [1].

East Bay Boulevard Closure
East Bay Boulevard will close a portion of the road beginning July 14. The closure is expected to last until the completion of utility work. The exact duration and details of the closure are not specified in the provided materials [1].

Alderbrook Boulevard Utility Work
A portion of Alderbrook Boulevard will be closed for utility work beginning July 14. The closure is expected to last until the utility work is completed. The exact duration and details of the closure are not specified in the provided materials [1].

Navarre Beach Bridge Southbound Lane Closure
The southbound lane of the Navarre Beach Bridge will close temporarily on Fridays and Saturdays in July to assist with traffic control following the U.S. Navy Blue Angels airshows. This closure will allow both lanes to be used for northbound traffic only, helping to ease congestion as attendees exit the beach following the airshow. The southbound lane is expected to reopen within two hours on both days, depending on traffic flow [2].

Impact on Traffic
These road closures and resurfacing projects are expected to cause temporary disruptions to traffic flow in Santa Rosa County. Motorists are advised to plan their routes accordingly and allow extra time for travel during the affected periods. Detours and alternative routes will be available to minimize the impact on commuters [1].

Conclusion
Santa Rosa County's ongoing road closures and resurfacing projects highlight the importance of infrastructure maintenance and improvement. These projects aim to enhance safety and efficiency on local roads, despite the temporary inconvenience they may cause. Motorists are encouraged to stay informed about these changes and plan their travel accordingly [1].

References
[1] https://www.santarosa.fl.gov/AlertCenter.aspx?CID=Santa-Rosa-County-Road-Bridge-Closures-5
[2] https://www.santarosa.fl.gov/CivicAlerts.aspx?AID=1818

Santa Rosa County Roadwork Schedule and Events for July 2025

Comments



Add a public comment...
No comments

No comments yet