Kumaraswamy Backs Bengaluru Tunnel Roads Project, Seeks Central Aid
ByAinvest
Tuesday, Jun 24, 2025 1:40 pm ET1min read
TWIN--
The tunnel roads project, championed by Deputy Chief Minister and Bengaluru Development Minister D. K. Shivakumar, has faced stiff opposition but now has unexpected support from the Union Minister for Heavy Industries and Steel. Kumaraswamy termed the project the "backbone of Bengaluru’s future transport infrastructure," addressing current bottlenecks, improving connectivity, and enabling long-term sustainable growth [1].
The project, which will connect Hebbal to Silk Board, will be implemented in two packages. Package 1, covering 8.748 km from Hebbal's Esteem Mall Junction to Seshadri Road, and Package 2, covering the same distance from Seshadri Road to Silk Board Junction, will use 8 Tunnel Boring Machines (TBMs) [2]. The total length of the twin tunnel road is 33.49 km, with a projected completion time of 38 months.
The project is expected to alleviate traffic congestion and improve connectivity in Bengaluru. The toll for vehicles using the one-way tunnel road is set at ₹19 per km, with the contractor having the right to collect tolls for 30 years post-construction [2]. The BBMP, which is implementing the project, is awaiting approval from the Finance Department before inviting tenders.
In addition to the tunnel roads project, Kumaraswamy also urged the Centre to support the Peripheral Ring Road (PRR) project. The PRR aims to decongest Bengaluru’s core areas and improve overall traffic management.
References:
[1] https://www.thehindu.com/news/cities/bangalore/hdk-bats-for-tunnel-roads-in-bengaluru-seeks-central-assistance-for-the-project/article69733213.ece
[2] https://newsable.asianetnews.com/karnataka-news/bengaluru-bbmp-to-build-twin-tunnel-from-hebbal-to-silk-board-under-17780-crore-corridor-plan-kmv/articleshow-t04ev6t
Union Minister H.D. Kumaraswamy has expressed support for Bengaluru's tunnel roads project, which aims to improve connectivity and address bottlenecks. The Karnataka Cabinet has approved ₹17,780 crore for the project, and Bengaluru Smart Infrastructure Limited is set to call global tenders. Kumaraswamy also urged the Centre to support the Peripheral Ring Road project to decongest the city's core areas.
Union Minister H.D. Kumaraswamy has expressed support for Bengaluru's tunnel roads project, which aims to improve connectivity and address current bottlenecks. The Karnataka Cabinet has approved a budget of ₹17,780 crore for the project, with Bengaluru Smart Infrastructure Limited set to call global tenders. Kumaraswamy also urged the Centre to support the Peripheral Ring Road project to decongest the city's core areas.The tunnel roads project, championed by Deputy Chief Minister and Bengaluru Development Minister D. K. Shivakumar, has faced stiff opposition but now has unexpected support from the Union Minister for Heavy Industries and Steel. Kumaraswamy termed the project the "backbone of Bengaluru’s future transport infrastructure," addressing current bottlenecks, improving connectivity, and enabling long-term sustainable growth [1].
The project, which will connect Hebbal to Silk Board, will be implemented in two packages. Package 1, covering 8.748 km from Hebbal's Esteem Mall Junction to Seshadri Road, and Package 2, covering the same distance from Seshadri Road to Silk Board Junction, will use 8 Tunnel Boring Machines (TBMs) [2]. The total length of the twin tunnel road is 33.49 km, with a projected completion time of 38 months.
The project is expected to alleviate traffic congestion and improve connectivity in Bengaluru. The toll for vehicles using the one-way tunnel road is set at ₹19 per km, with the contractor having the right to collect tolls for 30 years post-construction [2]. The BBMP, which is implementing the project, is awaiting approval from the Finance Department before inviting tenders.
In addition to the tunnel roads project, Kumaraswamy also urged the Centre to support the Peripheral Ring Road (PRR) project. The PRR aims to decongest Bengaluru’s core areas and improve overall traffic management.
References:
[1] https://www.thehindu.com/news/cities/bangalore/hdk-bats-for-tunnel-roads-in-bengaluru-seeks-central-assistance-for-the-project/article69733213.ece
[2] https://newsable.asianetnews.com/karnataka-news/bengaluru-bbmp-to-build-twin-tunnel-from-hebbal-to-silk-board-under-17780-crore-corridor-plan-kmv/articleshow-t04ev6t

Stay ahead of the market.
Get curated U.S. market news, insights and key dates delivered to your inbox.
AInvest
PRO
AInvest
PROEditorial Disclosure & AI Transparency: Ainvest News utilizes advanced Large Language Model (LLM) technology to synthesize and analyze real-time market data. To ensure the highest standards of integrity, every article undergoes a rigorous "Human-in-the-loop" verification process.
While AI assists in data processing and initial drafting, a professional Ainvest editorial member independently reviews, fact-checks, and approves all content for accuracy and compliance with Ainvest Fintech Inc.’s editorial standards. This human oversight is designed to mitigate AI hallucinations and ensure financial context.
Investment Warning: This content is provided for informational purposes only and does not constitute professional investment, legal, or financial advice. Markets involve inherent risks. Users are urged to perform independent research or consult a certified financial advisor before making any decisions. Ainvest Fintech Inc. disclaims all liability for actions taken based on this information. Found an error?Report an Issue

Comments
No comments yet