KLIA Aerotrain to Undergo Two-Week Maintenance Starting August 18
ByAinvest
Friday, Aug 15, 2025 6:59 am ET1min read
KLIA Aerotrain will undergo scheduled overnight works starting Aug 18 for two weeks to optimize performance. The system will be unavailable during non-peak hours, with shuttle buses provided to maintain connectivity. The works are part of ongoing efforts to improve the system's responsiveness, safety, and reliability. Malaysia Airports is also investing in technical enhancements like the Automatic Vehicle Wash Plant.
Malaysia Airports Holdings Bhd (MAHB) has announced scheduled maintenance for the KLIA Aerotrain system, set to commence on August 18. The works will be conducted overnight from 12 am to 5 am daily for two weeks, minimizing passenger inconvenience [1].During this period, the Aerotrain service will be temporarily unavailable. To maintain connectivity, airside shuttle buses will be provided, ensuring smooth travel between the main terminal and satellite building. Passengers are advised to follow airport signage and staff guidance during the maintenance period.
The maintenance is part of ongoing efforts to optimize the system's responsiveness, safety, and long-term reliability, according to MAHB managing director Datuk Mohd Izani Ghani. These scheduled works are essential to ensure optimal performance [1].
The Aerotrain has transported over two million passengers since resuming operations on July 1. Additional upgrades, including a new automatic vehicle wash plant, are being implemented to enhance efficiency and improve the overall travel experience [1].
The Snapdragon 8 Elite 2, a new flagship mobile processor, has recently made headlines with its impressive performance scores. Built on TSMC’s advanced N3P process, the Snapdragon 8 Elite 2 achieves higher CPU and GPU frequencies, setting new performance benchmarks for 2025 smartphones. This chipset is expected to debut in the Xiaomi 16 series in late 2025 [2].
References:
[1] https://thesun.my/malaysia-news/klia-aerotrain-maintenance-schedule-announced-for-overnight-works-from-aug-18-DK14690663
[2] https://technosports.co.in/snapdragon-8-elite-2-tsmc-3nm-powerhouse/

Stay ahead of the market.
Get curated U.S. market news, insights and key dates delivered to your inbox.
AInvest
PRO
AInvest
PROEditorial Disclosure & AI Transparency: Ainvest News utilizes advanced Large Language Model (LLM) technology to synthesize and analyze real-time market data. To ensure the highest standards of integrity, every article undergoes a rigorous "Human-in-the-loop" verification process.
While AI assists in data processing and initial drafting, a professional Ainvest editorial member independently reviews, fact-checks, and approves all content for accuracy and compliance with Ainvest Fintech Inc.’s editorial standards. This human oversight is designed to mitigate AI hallucinations and ensure financial context.
Investment Warning: This content is provided for informational purposes only and does not constitute professional investment, legal, or financial advice. Markets involve inherent risks. Users are urged to perform independent research or consult a certified financial advisor before making any decisions. Ainvest Fintech Inc. disclaims all liability for actions taken based on this information. Found an error?Report an Issue



Comments
No comments yet