TotalEnergies Completes GGIP Contracts in Iraq, Marks Final Stage of Gas Growth Integrated Project
PorAinvest
lunes, 15 de septiembre de 2025, 4:06 am ET1 min de lectura
TTE--
The seawater treatment plant, to be built near Um Qasr, will treat and transport 5 million barrels of seawater per day to the main oil fields in southern Iraq, playing a crucial role in preserving the country's water resources [1]. The redevelopment of the Ratawi oil field, which began in September 2023, will see its production increase to 210,000 barrels per day by 2028, without any routine flaring [1].
Additionally, TotalEnergies has signed a Heads of Agreement (HoA) with KOGAS, South Korea’s national natural gas company, to supply 1 million tons of LNG per year for a 10-year period starting from the end of 2027. This agreement increases the volume of LNG supplied by TotalEnergies to KOGAS to 3 million tons per year from 2028 onward [2]. The LNG will be sourced from TotalEnergies’ global supply portfolio, including its U.S. LNG production and offtake.
These developments underscore TotalEnergies' commitment to sustainable energy solutions and its strategic positioning in the global energy market. The company aims to increase the share of natural gas in its sales mix to nearly 50% by 2030, as part of its broader strategy to reduce carbon emissions and eliminate methane emissions associated with the gas value chain [2].
TotalEnergies has launched the final contracts of the Gas Growth Integrated Project (GGIP) in Iraq. The project, led by TotalEnergies, includes the construction of a seawater treatment plant and the redevelopment of the Ratawi oil field. The seawater treatment plant will treat and transport 5 million barrels of seawater per day to main oil fields in southern Iraq, preserving the country's water resources. The Ratawi field redevelopment will increase production to 210,000 barrels per day from 2028, with no routine flaring.
TotalEnergies has announced the start of construction for the seawater treatment plant and phase 2 of the redevelopment of the Ratawi oil field, marking the completion of the final contracts for the Gas Growth Integrated Project (GGIP) in Iraq [1]. This project, led by TotalEnergies with a 45% stake, alongside Basra Oil Company (30%) and QatarEnergy (25%), encompasses four key components: natural gas, solar, oil, and water.The seawater treatment plant, to be built near Um Qasr, will treat and transport 5 million barrels of seawater per day to the main oil fields in southern Iraq, playing a crucial role in preserving the country's water resources [1]. The redevelopment of the Ratawi oil field, which began in September 2023, will see its production increase to 210,000 barrels per day by 2028, without any routine flaring [1].
Additionally, TotalEnergies has signed a Heads of Agreement (HoA) with KOGAS, South Korea’s national natural gas company, to supply 1 million tons of LNG per year for a 10-year period starting from the end of 2027. This agreement increases the volume of LNG supplied by TotalEnergies to KOGAS to 3 million tons per year from 2028 onward [2]. The LNG will be sourced from TotalEnergies’ global supply portfolio, including its U.S. LNG production and offtake.
These developments underscore TotalEnergies' commitment to sustainable energy solutions and its strategic positioning in the global energy market. The company aims to increase the share of natural gas in its sales mix to nearly 50% by 2030, as part of its broader strategy to reduce carbon emissions and eliminate methane emissions associated with the gas value chain [2].

Divulgación editorial y transparencia de la IA: Ainvest News utiliza tecnología avanzada de Modelos de Lenguaje Largo (LLM) para sintetizar y analizar datos de mercado en tiempo real. Para garantizar los más altos estándares de integridad, cada artículo se somete a un riguroso proceso de verificación con participación humana.
Mientras la IA asiste en el procesamiento de datos y la redacción inicial, un miembro editorial profesional de Ainvest revisa, verifica y aprueba de forma independiente todo el contenido para garantizar su precisión y cumplimiento con los estándares editoriales de Ainvest Fintech Inc. Esta supervisión humana está diseñada para mitigar las alucinaciones de la IA y garantizar el contexto financiero.
Advertencia sobre inversiones: Este contenido se proporciona únicamente con fines informativos y no constituye asesoramiento profesional de inversión, legal o financiero. Los mercados conllevan riesgos inherentes. Se recomienda a los usuarios que realicen una investigación independiente o consulten a un asesor financiero certificado antes de tomar cualquier decisión. Ainvest Fintech Inc. se exime de toda responsabilidad por las acciones tomadas con base en esta información. ¿Encontró un error? Reportar un problema

Comentarios
Aún no hay comentarios