TC Energy Reports Q2 Non-GAAP EPS of C$0.82, Updates FY Outlook
PorAinvest
jueves, 31 de julio de 2025, 6:40 am ET1 min de lectura
TRP--
The company's President and Chief Executive Officer, François Poirier, commented on the results, stating that "Our commitment to safety and operational excellence continues to drive strong reliability, availability and financial performance, and we now expect our 2025 comparable EBITDA outlook to be higher, in the range of $10.8 to $11.0 billion” [1].
Operational highlights include the Southeast Gateway pipeline coming into service and the commencement of toll collection from the Comisión Federal de Electricidad (CFE) in May 2025 [1]. Additionally, the East Lateral XPress (ELXP) project, an expansion on the Columbia Gulf system, was placed in service in May 2025 [1]. The company also reported strong availability rates for its Bruce Power and Cogeneration power plant fleets, achieving 98% and 93.4% availability, respectively, in the second quarter [1].
TC Energy’s financial outlook for 2025 has been revised upward, with comparable EBITDA now expected to be between C$10.5 billion and C$11.5 billion [1]. The company also expects to place approximately C$8.5 billion of capital projects into service this year, on time and approximately 15% below budget [1].
The company's performance underscores the strength of its business model and its ability to deliver solid growth, low risk, and repeatable performance. TC Energy’s Board of Directors approved a quarterly common share dividend of C$0.85 per common share for the quarter ending September 30, 2025, equivalent to C$3.40 per common share on an annualized basis [1].
References:
[1] https://www.nasdaq.com/press-release/tc-energy-reports-strong-second-quarter-2025-operating-and-financial-results-2025-07
TC Energy reported Q2 non-GAAP EPS of C$0.82, up from C$0.82 in Q2 2024. Comparable EBITDA increased to C$2.6 billion from C$2.3 billion in Q2 2024. Segmented earnings rose to C$2.0 billion from C$1.7 billion in Q2 2024. The company updated its FY outlook, with comparable EBITDA expected to be between C$10.5 billion and C$11.5 billion in 2025.
TC Energy Corporation (TSX, NYSE: TRP) has released its second quarter 2025 financial results, highlighting robust operational performance and an upward revision to its 2025 financial outlook. The company reported non-GAAP EPS of C$0.82, up from C$0.82 in Q2 2024 [1]. Comparable EBITDA increased to C$2.6 billion, a rise of C$0.3 billion from the same period last year [1]. Segmented earnings also saw an increase, rising to C$2.0 billion compared to C$1.7 billion in Q2 2024 [1].The company's President and Chief Executive Officer, François Poirier, commented on the results, stating that "Our commitment to safety and operational excellence continues to drive strong reliability, availability and financial performance, and we now expect our 2025 comparable EBITDA outlook to be higher, in the range of $10.8 to $11.0 billion” [1].
Operational highlights include the Southeast Gateway pipeline coming into service and the commencement of toll collection from the Comisión Federal de Electricidad (CFE) in May 2025 [1]. Additionally, the East Lateral XPress (ELXP) project, an expansion on the Columbia Gulf system, was placed in service in May 2025 [1]. The company also reported strong availability rates for its Bruce Power and Cogeneration power plant fleets, achieving 98% and 93.4% availability, respectively, in the second quarter [1].
TC Energy’s financial outlook for 2025 has been revised upward, with comparable EBITDA now expected to be between C$10.5 billion and C$11.5 billion [1]. The company also expects to place approximately C$8.5 billion of capital projects into service this year, on time and approximately 15% below budget [1].
The company's performance underscores the strength of its business model and its ability to deliver solid growth, low risk, and repeatable performance. TC Energy’s Board of Directors approved a quarterly common share dividend of C$0.85 per common share for the quarter ending September 30, 2025, equivalent to C$3.40 per common share on an annualized basis [1].
References:
[1] https://www.nasdaq.com/press-release/tc-energy-reports-strong-second-quarter-2025-operating-and-financial-results-2025-07

Divulgación editorial y transparencia de la IA: Ainvest News utiliza tecnología avanzada de Modelos de Lenguaje Largo (LLM) para sintetizar y analizar datos de mercado en tiempo real. Para garantizar los más altos estándares de integridad, cada artículo se somete a un riguroso proceso de verificación con participación humana.
Mientras la IA asiste en el procesamiento de datos y la redacción inicial, un miembro editorial profesional de Ainvest revisa, verifica y aprueba de forma independiente todo el contenido para garantizar su precisión y cumplimiento con los estándares editoriales de Ainvest Fintech Inc. Esta supervisión humana está diseñada para mitigar las alucinaciones de la IA y garantizar el contexto financiero.
Advertencia sobre inversiones: Este contenido se proporciona únicamente con fines informativos y no constituye asesoramiento profesional de inversión, legal o financiero. Los mercados conllevan riesgos inherentes. Se recomienda a los usuarios que realicen una investigación independiente o consulten a un asesor financiero certificado antes de tomar cualquier decisión. Ainvest Fintech Inc. se exime de toda responsabilidad por las acciones tomadas con base en esta información. ¿Encontró un error? Reportar un problema

Comentarios
Aún no hay comentarios